SERVICE FOCUS

LASER 3 PLUS RANGE

EASILY INSTALLED BY ONE PERSON

Light and compact, the SERVOTOUGH Laser 3 Plus TDL monitor range is simple to install. Unlike the cumbersome design of traditional TDL analyzers, which occupy a large installation footprint and typically takes two people to install, the Laser 3 Plus can be installed quickly by just one person in five easy steps – reducing costs and saving valuable space in confined areas.

SIMPLE FIVE-STEP INSTALLATION:

STEP 1 STEP 2 STEP 3
Attach the flange to the side of the flue and secure by tightening bolts.
To mount the transmitter, align the three mounting screws with the corresponding openings on the flange, twist into place, and secure by tightening the three screws.
Repeat the installation process on the other side of the flue for the receiver.
STEP 4 STEP 5
COMMISSIONING
Remove the front panel and connect cables to the base of the transmitter, then re-secure the panels.
Switch on and align using built-in color display.
While installation is designed to be straightforward, we recommend initial commissioning by a trained Servomex engineer. A trained engineer will be able to advise on ongoing maintenance and train site engineers on best practice. This provides maximum performance, reliability, safe operation and cost-saving benefits of your analyzer from day one.
Watch the installation video at: servomex. com / l3plus-install
For information on all our nine service products visit servomex. com / service