HSE International ISSUE 93 | Page 17

one project approach. By 2013, we had halved the number of RIDDORS and OSHA reported injuries across the project.” ADSL work with a small number of partners and strategic suppliers including Sodexo, Babcock, MUJV (a utility joint venture between UKPNS and Veolia), Colas and Rollalong, to deliver complex, high value operations and has developed a long term strategic relationship with these organisations. “It is vital that a subcontractor’s approach to health and safety matches our own,” Andrew Ingram, Head of Procurement said. “The contractor selection and evaluation process takes the form of a two part category based questionnaire. It is comprised of a standard question set, which includes evidence of insurance, acceptance of Terms and Conditions and QHSE contractual obligations. “Part two relates to the specific Category with a question set developed by the SME and Category Manager following a Sustainability Assessment. This assessment is proportionate to the risk and complexity of the category and forms the basis of minimum standards and continual improvement.” All work activities completed by contractors must be supported with an ADSL Authority to Proceed (ATP). Prior to ATP issue, the contractor must receive an ADSL health, safety and environmental contractor induction and demonstrate their competence to perform and supervise their work. ROLLALONG PERMANENT MODULAR CONSTRUCTION Proud to work with Aspire Defence Services Ltd A DSL utilises three methods to monitor the performance of contractors. Factual and objective information is gathered on each contractor’s performance and Sponsor of the Garrison Soapbox Derby go-kart entry compliance. End-user experiences are obtained in respect of service, compliance, QHSE obligations and response times. Permanent Modular Buildings These are then collated against a defined set of questions known as a Supplier Performance Review (SPR). Finally, the contractor’s experience of working with ADSL is considered and discussed together with the SPR at six monthly intervals (or a time frame dependent on the size and complexity of the 82x125mm Rollalong Faster ad V2.indd 1 15/10/2014 contract). “Our commitment to health and safety and the importance of everyone’s engagement with it is recognised by our subcontractors. We stress how personal ownership of health and safety by every one of us is the key to changing unsafe behaviours,” Andrew explained. “For some of our partners, this contract leads the way for them in health and safety across their entire client base. Smaller companies subcontracting to us report that they have realised the benefits. The standards we have introduced them to have enabled them to win contracts with other organisations.” www.rollalong.co.uk Monitoring and Measuring To measure the success of Health and Safety management and initiatives, operational monitoring is carried out through third party audits and Compliance Evaluations, undertaken on a scheduled monthly cycle against a specific piece of health, safety and environmental legislation. Across the business, Garrison Facilities Directors and Health, Safety and Environment Managers develo