How 5 Things Will Change The Way You Approach BIM How 5 Things Will Change The Way You Approach BIM | Page 8
4-BIM CLASH DETECTION
In this process, different models of different disciplines are combined.
While combining, BIM engineers check for the collision and clashes.
If any clash or interference are detected they are solved within the BIM model.
Many times, changes like re-routing of ducts, change in ceiling heights or change
in slabs position are done to resolve the clashes.
No BIM process is complete without BIM coordination drawings.