A key challenge was the building’ s dualaspect position. The coffee shop needed to serve customers from both the High Street and Platform 1 while maintaining security and controlling movement between the two environments.
A bespoke walnut counter was developed in collaboration with the operator to address this requirement. Its dual-serving arrangement allows customers to be served from both elevations while maintaining the necessary security measures.
Walnut was also used for a bespoke partition wall incorporating a discreet staff door. The material was selected to complement the restored brickwork and newly uncovered arches, creating a consistent relationship between the building’ s historic fabric and the new interior.
The electrical installation was upgraded throughout the café and kitchen areas, with new supplies installed where required. Galvanised tray work was used for electrical runs, providing a robust solution that complemented the industrial character of the design.
High-performance vinyl flooring was installed to withstand the demands of heavy passenger footfall while providing a durable and contemporary finish.
The completed arrangement provides an active commercial use for previously redundant space while retaining the building’ s architectural character.
Revealing the hidden arches
The discovery of three original arches within the masonry became one of the defining moments of the project.
Hidden behind later additions, the arches had not been identified before the refurbishment began. Their discovery presented an opportunity to recover an element of the building’ s historic character that had been concealed for years.
Rather than covering or altering the features, INVVU restored the arches and made them a visible part of the completed building.
Their reinstatement has strengthened the relationship between the refurbished frontage and the station’ s original architecture, while adding an unexpected layer to the building’ s history.
The discovery also illustrates the value of careful investigation when working with older buildings. By understanding what lies behind later interventions, refurbishment projects can uncover original features that may otherwise remain hidden or be lost through unnecessary replacement.
In this case, retaining the masonry and investigating the existing fabric allowed INVVU to preserve an important part of the station’ s architectural history.
Improving accessibility
Heritage considerations were balanced with the need to provide a building that works for contemporary users.
Before refurbishment, a step at the entrance created a physical barrier for passengers with reduced mobility, wheelchair users and those travelling with pushchairs or luggage.
Removing the step created step-free access to the units for the first time. Wider doorways, improved lighting and clearer signage further improved accessibility.
The work demonstrates how accessibility improvements can be incorporated into a heritage-led refurbishment without undermining the character of the building.
The project also had to consider the station’ s operational environment. Works were confined to Platform 1 and the streetfacing frontage, away from the operational railway. No line closures, track isolations or railway possessions were required, allowing the refurbishment to be completed without disruption to train operations or passenger services.
Listed Building Consent was obtained before work commenced, with the consenting process proceeding without additional design amendments or conditions from the local conservation authority.
Repairing and protecting the building
Repair and long-term protection formed an important part of the refurbishment.
Damage caused by a previous vehicle strike required attention before the wider works could be completed. The existing brickwork was cleaned to expose and assess the affected area, with original bricks carefully reclaimed and reused in the reconstruction of the damaged dwarf wall.
This repair-first approach maintained material continuity and avoided introducing visually inconsistent replacement masonry.
New guttering was also installed to improve protection of the building fabric, while the hardwood façades, canopy supports and ironmongery were refurbished or renewed as appropriate.
The project team adopted the principle that original fabric should be retained, repaired and protected wherever practical, rather than replaced unnecessarily.
That approach continues beyond completion. Southeastern has put in place a planned preventative maintenance programme covering the restored façades, canopy supports, ironmongery, brickwork and uncovered arches.
Regular inspections will allow deterioration to be identified and addressed at an early stage, with future interventions intended to use materials and methods sympathetic to the historic building.
Building a legacy beyond the station
The project also provided an opportunity to support the next generation of construction and design professionals.
INVVU embedded T Level students and apprentices within the project team, giving them experience across both design and site phases.
Working alongside experienced professionals, those involved gained exposure to a live heritage project and the practical challenges of working on a publicly visible historic building.
The training element adds another dimension to the project’ s legacy. Alongside the physical restoration, the scheme provided an opportunity to develop skills and experience that can be carried into future conservation and construction projects.
With the refurbishment completed in February 2026, the project has returned previously underused space to active commercial use while strengthening the relationship between the Platform 1 frontage and Tunbridge Wells station’ s historic character.
The £ 271,000 scheme was funded by Southeastern, Network Rail and the Railway Heritage Trust, with contributions of £ 45,000, £ 170,000 and £ 56,000 respectively.
For a Grade II listed station that has served the town since the mid- 19th century, INVVU’ s refurbishment demonstrates how sensitive intervention can combine conservation, commercial reuse and modern accessibility.
Most importantly, the discovery and restoration of the three hidden arches means the work has not simply preserved what was already visible. It has revealed another part of the station’ s history and brought that previously concealed fabric back into view for passengers and the wider community.