13
Specials
Drawing and calculating
For the entire process, safety was the primary consideration.
strength and stability calculation is carried out in every phase, Mobile industrial platform
stepladder
as standard. In this regard, Altrex is unique within the sector, Movable stepladder 5-steps (45°)
We took this into account even during the drawing phase. The
and we are rightly proud of this.
Safety and certainty
The construc tions for RAVO were tested after construction.
Because, alongside safety, Altrex also champions certainty.
We continue to monitor and collaborate even after assembly.
Working with new solutions often also provides new insights.
This led to to a genuinely customised solution for RAVO.
“We have noticed that safety awareness with regard to work
has improved’, says Nelly Raap-Appel, operational support
and facility manager for RAVO. ‘It is often a topic of con-
versation on the work floor. Employees work quicker, more
easily and move around and lift things a lot less. All in all, this
confirms we made the right choice in Altrex.”
Nelly Raap-Appel
Operational Support and Facility manager
Container stairs
Standard and custom made
Assembly, maintenance
and cleaning: an Altrex
solution for every stage
A production line with various different process steps requires
smart and above-all variable solutions. RAVO is now working
more safely and efficiently. On, next to and around every
cleaning truck. RAVO and its employees have been working
with access equipment from Altrex for some time now. Along- Altrex developed a container stairs for tankcontainer
side a more efficient working method, everyone regards the trucks for one of the worlds largest oil companies. The
solutions as a valuable addition to the production process and stairs enables the filling, sampling and inspection of the
an improvement to safety. ■ tankcontainer to be easier, quicker and safer. The top
of the container stairs is equipped with a safety cage to
protect the user.