Heat Exchanger World Magazine February 2023 | Page 12

Industry News

Industry News

Endurant
Energy acquires GEOptimize
Antonov delivers heat exchanger to Saudi Arabia
Antonov Airlines is continuing to fly the skies transporting oversized cargo across the globe . The company has recently been hired to move a 90-tonne heat exchanger on short notice . Antonov Airlines was tagged by DHL Global Forwarding to transport the heat exchanger and additional accessories on board its AN-124-150 aircraft from Italy to Saudi Arabia . The weight of the cargo including the heat exchanger and accessories reached 105 tonnes . “ The external cranes in conjunction with the onboard winch of the
AN-124-100 were used to load and unload the HP Steam Superheater on the stand specially designed and manufactured for air transporting , as well as special loading equipment designed and manufactured by Antonov ’ s in-house engineers ,” said Olha Danylova , Commercial Executive , Antonov Airlines . The delivery to Saudi Arabia follows a recent transport of an oversized aircraft engine , together with critical tooling Luxembourg to Lajes , Portugal , a remote island in the Azores , onboard one of AN-124- 100M aircraft .
With GEOptimize in-house , Endurant Energy ’ s position as the leading North American designbuild-own-operate geothermal heat exchange system developer is confirmed , while GEOptimize is positioned for further growth . Distributed energy resource ( DER ) developer Endurant Energy ( Endurant ) has completed the acquisition of specialist geothermal heating and cooling and ground source heat pump ( GSHP ) design company , GEOptimize , Inc . Endurant ’ s ownership positions GEOptimize to accelerate growth by taking advantage of the increased interest in low-carbon heating and cooling solution utilizing GSHPs . With GEOptimize in-house , Endurant ’ s position as North America ’ s marketleading geothermal developer is strengthened . GEOptimize supports every aspect of geothermal feasibility and design ,
ensuring the long-term and efficient operations of a system . Their specialist geo-forensics monitoring and troubleshooting services can improve the design of existing systems . They also offer highly commended Certified Geothermal Design courses for sustainable energy professionals . Endurant is a full-service developer and owner of cost-effective , resilient , and sustainable energy solutions . It serves a wide range of sectors including education , commercial , industrial , real estate , healthcare , hospitality , and public utilities . Endurant offers a host of full-service clean energy solutions incorporating GSHPs , including microgrids and integrated ecodistricts . Having been involved in the origins of the technology , Endurant pioneered the energy foundation concept , installing geothermal loops as concrete is poured into piles .
Valmet to upgrade coating section at Stora Enso Imatra Mills
Valmet upgrades the coating section of board machine 5 at Stora Enso Imatra Mills , Tainionkoski in Finland . In addition to electric heated OptiDry Coat air dryers , the upgrade includes a drying capacity increase in the coating section , a new wire loop to the existing dryer group , and automation . The upgrade will bring energy savings and reduce emissions . The order was included in Valmet ’ s orders received for the third quarter of 2022 . The value of the order will not be disclosed . The value of deliveries of this type is usually around EUR 5 – 8 million . The installations are planned to start in the fourth quarter of 2023 .
“ The delivery helps the customer to take another step forward on their path to a CO2 free future . By replacing the old gas heated dryers by modern electric heated air dryers , the customer can reduce energy consumption for the existing board grades and ensure higher production capacity . The new wire loop will create an additional draw point for the web and allows controlled operating in the modified area . This will bring more safety in tail threading and minimise oil leakages ,” says Kimmo Vehmas , Senior Mill Sales Manager , EMEA , Valmet .
China ’ s demonstration HTR-PM reaches full power
The demonstration High Temperature Gas-Cooled Reactor- Pebble-bed Module ( HTR-PM ) at the Shidaowan site in Shandong province of China has reached its initial full power with “ stable operation under the mode of ‘ two reactors with one machine ’”. The plant features two small reactors that drive a single 210 MWe turbine . It is owned by a consortium led by China Huaneng
( 47.5 %), with China National Nuclear Corporation subsidiary China Nuclear Engineering Corporation ( 32.5 %) and Tsinghua University ’ s Institute of Nuclear and New Energy Technology ( 20 %), which is the research and development leader . They reported that it had reached “ initial full power ” on 9 December and “ this operating state has verified that all systems of the
demonstration project meet the design functions , laying the foundation for the project to be put into operation ”.
The Huaneng Shidaowan High Temperature Gas-Cooled Reactor Demonstration Project is the world ’ s first pebble bed modular hightemperature gas-cooled reactor , and having achieved the initial fullpower operation of the dual reactors and “ tested the operation control capability ” of it in “ two reactors with one machine ” mode , the operators describe it as “ laying the foundation for future commercial operation ”.
12 Heat Exchanger World February 2023 www . heat-exchanger-world . com