Course Updates
THE LATEST UPDATES FROM EASTERN GOLF CLUB IN MELBOURNE.
Another great month on site in
Yering with the course, clubhouse
and maintenance facility forging
ahead with work.
The 50 meg main irrigation dam
has commenced being filled out of
the lower wetland waterbodies in
preparation for a very big Spring of
turf establishment.
Concrete paving at the maintenance
facility has been poured.
18th Hole
The Clubs secondary storage dam of
40 meg, is about 60% constructed.
Also they have a third reserve water
storage body that hols 30 meg. 120
meg of water storage plus more than
100 meg more in the wetlands.
As updated to members at the
previous member information
session, the Club has secured
The Par 3 8th Hole takes shape with
greenside bunkers finished.
extensive water lifting rights
from the Yarra to ensure we have
ample supply for grow-in and
future operations. An interesting
comparison is that at Doncaster, in
total they can store 33 meg in the
three (3) dams.
The Members Lounge in the Clubhouse
progresses well.
16th Green Complex