GeminiFocus July, 2015 | Page 13

Contributions by Gemini staff News for Users Thermal noise in FLAMINGOS-2 has been returned to normal levels; fixes are on the way for the GMOS-South Hamamatsu CCDs; and Gemini mask-making software has been made more effective and user friendly for both Gemini South and North. Also, at Gemini North, an independent report on the dome shutter failures is due in July. Guarding Against Future Shutter Failures As Gemini Observatory and its users are both painfully aware, Gemini North lost a large amount of time in 2013B and 2014A due to two dome shutter failures. Since those events, we have carried out internal engineering studies, which resulted in a redesign of parts of the shutter drive gearboxes, and have procured spares (Figure 1) to speed the recovery process from a future similar failure, should one occur. Also, we have engaged an external contractor to carry out a completely independent study of the dome and its mechanisms, to ensure that nothing is missed. Request for Bids for this consulting work was released in the early part of 2015, and Dynamic Structures was awarded the consulting contract in March. July 2015 Figure 1. A fully assembled, spare shutter gearbox at Gemini North. Redesigned torque arms are at the top of the assembly. GeminiFocus 11