GeminiFocus 2017 Year in Review | Page 51

Gemini staff contributions On the Horizon A collection of 2017 highlights from Gemini’s instrumentation development efforts which will expand our future capabilities to do cutting-edge science. JANUARY 2018 GHOST Cassegrain Unit Fully Assembled The build of the GHOST Cassegrain unit is nearly complete. In November, Gemini staff participated in weighing and inspecting the fully assembled unit at the Australian Observatory (AAO) lab in North Ryde, New South Wales. The unit is currently on its way to Chile. In December, Gemini representatives spent a week at the AAO testing the In- tegral Field Unit (IFU) positioner and verifying the assembly and operation of the electron- ics and software of the Cassegrain unit. Following over four days of inspections, tests, and demonstrations, the positioner, electronics, and software were accepted for shipment to Gemini South. The electronics unit is expected to be shipped to Chile by year’s end where the team will begin preliminary testing and