GELECEĞİ YAKALA PROJESİ 21. YY. BECERİLERİ ETKİNLİK PLANLARI "Cartch the Future" Project Result | Page 22

“CATCH THE FUTURE ”ACTIVITY PLAN The simulation on the Phet platform opens on the interactive board and explains the concepts of force, compound force, balanced and unbalanced force by applying different values. A photo of any of the designed bridges during the load test is shown on the screen. The composite forces, balanced and unbalanced forces on the photo are shown by drawing. After designing a virtual bridge and drawing a bridge prototype on paper, the student groups design their bridges in accordance with the given problem and criteria and then present/explain this design to the other students in a short way before the loading test. They explain what they thought when designing and why they made such a design. The most appropriate one of the bridge designs is selected after the loading test. (Of course, all bridges were damaged or demolished at this stage.) After that, student groups prepare a more comprehensive presentation using the photographs, experiences and information obtained during the whole process. (Google Slides, Power Point, Prezi, etc. different presentation tools can be used.) Reflection Activities of the Student In addition, each group prepares a report at the end of the application by referencing the scientific research steps. This report tells the story of the project: what was your problem, what kind of information did you collect and how did you access this information, how did you design a solution for the problem, did the product/prototype you created contribute to the solution of the problem, where were the errors and how did you correct them, what is the data obtained after the application? Student groups send their presentations and reports to the teacher via Beyazpano (easyclass) after the event. Figue 20 - Gogole Slides Figure 21 – Beyazpano (easyclass) Groups think about their bridge designs. Discuss aspects that are positive and need to be improved. Since the bridges that have been built have to be demolished, they design a new bridge and aim to increase the strength/weight ratio. Developing Process The Iron Triangle of engineering can be mentioned at this stage. According to this, only two of these three qualities can be made at the same time. He asked students, " how would you achieve this balance in a structural engineering project like Bridge Construction?" the question is posed. (For example, when a more durable bridge is [2017-1-TR01-KA101-037764] the “Catch the Future” Project under contract number Erasmus+ is supported by the European Commission. However, the European Commission and the Turkish National Agency cannot be held responsible for the views contained herein.