Garner Economic Development 2018-19 Annual Report 1 | Page 9

NCDOT-LED 1 I-40 WIDENING This NCDOT-led project is widening I-40 from the intersection with I-440 in southeast Raleigh to NC 42 in Johnston County. The project is under construction and will add two lanes in each direction from I-440 to US 70 Bypass and one lane from US 70 Bypass to NC 42. Construction is being conducted in phases from north to south. All construction is expected to be complete by 2022. 2 US 70, TIMBER DR. & HAMMOND RD. This NCDOT-led project will introduce a Continuous Flow Intersection with the goal of improving the intersection's operational efficiency. The Town is working with NCDOT to include sidewalks and to identify and include safe pedestrian crossings of both US 70 and Timber Drive. Construction is expected to begin in late 2020 or early 2021. 4 5 WHITE OAK, HEBRON CHURCH & ACKERMAN ROADS This Town-led project has examined a geometrically challenging, unsafe and congested intersection of three state-maintained roads with the goal of improving operational efficiency and safety. Town-sponsored design of a partial dual-lane roundabout is nearing completion. Furthermore, the Town successfully applied for Locally Administered Project Program (LAPP) funds managed by the Capital Area MPO (CAMPO) to complete right- of-way acquisition and construction of the project. The funds for this work will be available in October 2019. US 401 SYNCHRONIZED STREET This NCDOT-led project will widen the existing road to six lanes and add synchronized improvements from a point just north of Annaron Court to a point just south of Old Stage Road. The Town is sharing in the costs of sidewalks and other pedestrian improvements along the corridor. Construction is expected to begin in 2020. 3 TOWN-LED 6 TIMBER DRIVE SIDEWALKS This Town-led project will connect missing sidewalk gaps along the south side of Timber Drive: between Blanton Street and Stowe Place, and between Harth Drive and NC 50 (Benson Road). Additional right-of-way acquisition and environmental reporting is nearing completion so that construction may occur in the first half of 2020. NC 50/BENSON RD. BRIDGE REPLACEMENT This NCDOT-led project will replace an aging bridge over US 70 and improve adjacent intersections on Benson Road. Design work is complete and right-of-way is being acquired. A new bridge will be constructed adjacent to the existing bridge so as not to disrupt existing traffic patterns. Construction is expected to begin in 2020. 9