GANGA 55th Issue | Page 8

resettled Indira Sagar Dam and the entire process of rehabilitation was in shambles. The Indira Sagar project in Surat at Punasa There were several discrepancies in the lists is the other major project proposed in the of Project Affected People. While the policy Narmada basin with the largest storage clearly states a "land for land" position, the capacity in the country. The project is government has violated this by not located near Punasa village in Khandwa providing alternate land and introducing district, M.P. This multipurpose river valley cash for land. The policy states that the project envisages construction of a concrete valuation of land is to be based on the value gravity dam, 653 m long and 92 m high, of similar land in the command area, but this with gross storage capacity of the reservoir has not been the case. The land has been of 12.22 km3, and live storage of 9.75 km3 to grossly under valued. The principle of provide an annual irrigation potential of community rehabilitation had also not been 2 1690 km and a generation of 1000 MW of honoured. hydropower. The project also ensures Landless labourers have been compensated supply of 7,40,00,000 m3 of drinking water only with cash and no sources of alternate to rural areas in Khandwa district. In means of livelihood have been envisaged. A Water Special Rehabilitation Package has also Development Tribunal Award, an annual been declared for the farmers and the regulated flow of 10.02 km3 shall be landless labourers. However, even this has released to the Sarder Sarover project. The not been sufficient to help the people operation of Indira Sager project will be rehabilitate themselves. Compensation for carried out in such a way so as to facilitate house and houseplots were not sufficient. the regulation of Sarder Sarover project. Rehabilitation sites that had been 'developed' accordance with Narmada were inadequate, both with respect to the Manthan Adhyayan Kendra had conducted number of sites as well as the civic an investigation about the situation of amenities that were 'provided' at these sites. village Jabgaon, one of the villages to be Corruption at each level of the p rocess of submerged by the Indira Sagar Pariyojana. resettlement and rehabilitation was reported The team found that the village has been 8 Integrated River Basin Management Society