A decade of building
Facilities
Fire Department
operated from 16 fire
stations. EOC and 9-1-1
Dispatch Center remodel NEW Fire Station 9 was
projects were completed. completed using 1997 bond
funds. It was moved from
South Cooper to its new
location on Wimbledon.
NEW Fire Resource
facility was opened to
serve the Department’s
growing logistical needs.
Storage facility was built
behind the Department's
Reserve Apparatus Facility
Department saw the implementation of to address additional fleet
a “temporary” Fire Station 17 which was and equipment logistic
designed to serve far north Arlington and issues.
a new development called “Viridian."
TOP OF PARAPET
130' - 0"
STATION ROOF
128' - 0"
APPARATUS BAY ROOF
124' - 0"
SECOND LEVEL
114' - 0"
GROUND LEVEL
100' - 0"
NORTH ELEVATION
APPARATUS BAY ROOF
124' - 0"
SECOND LEVEL
114' - 0"
GROUND LEVEL
100' - 0"
3/16" = 1'-0"
4
TOP OF PARAPET
130' - 0"
STATION ROOF
128' - 0"
APPARATUS BAY ROOF
124' - 0"
SECOND LEVEL
114' - 0"
EAST ELEVATION
3/16" = 1'-0"
TOP OF PARAPET
130' - 0"
STATION ROOF
128' - 0"
3
GROUND LEVEL
100' - 0"
WEST ELEVATION
3/16" = 1'-0"
2
TOP OF PARAPET
130' - 0"
STATION ROOF
128' - 0"
APPARATUS BAY ROOF
124' - 0"
SECOND LEVEL
114' - 0"
GROUND LEVEL
100' - 0"
SOUTH ELEVATION
City of Arlington
Ott Cribbs Public Safety Building
620 W Division Street
Arlington, Texas 76010
[T] -
[F] -
Arlington Fire Station No.1
EXTERIOR ELEVATIONS
-
6.01
4/6/2020
3/16" = 1'-0"
1
Arlington citizens voted
for a 2014 bond package
authorizing a rebuild
of Fire Station 1 and NEW Fire Station 5 was
improvements to Fire completed using 2008 bond
Training. Construction funds.
begins in summer 2020.
PGAL
Fire Station 12 was
remodeled and readied
for an ARFF unit using NEW Fire Station 17 was
2008 bond funds. completed.
16
Arlington citizens voted
for a 2018 bond package
authorizing a rebuild of Fire
Station 8 (to be completed
in 2023) and Fire Station 6
(to be completed in 2025).