Changes to the Fee Schedule
Proposed Changes to the Fee Schedule
To ensure transparency , the Town documents annual changes to the fee schedule . For FY25 , the fee schedule has been reformatted and consolidated for clarity and ease of reading . The following changes will go into effect on July 1 , 2024 with the approval of the operating budget .
Section 1 – Executive , Finance and Administrative Fees No changes proposed for FY25 .
Section 2 – Development Services Fees
ENGINEERING FEES
�
Initial Construction Drawing Fee ( Includes 2 reviews and 1 signature submittal Flat Fee increased from $ 500 to $ 600 + Per Unit Fee $ 10 / lot
� Subsequent Construction Drawing Fee ( per each additional review ) of $ 300 � �
Sidewalk / Green way Inspections increased from $ 0.75 / linear / ft to $ 1.50 / linear / ft
Curb and Gutter Inspections increased from $ 0.75 / linear / ft to $ 1.50 / linear ft � Curb Cut Inspections Flat Fee increased from $ 75 to $ 100 + $ 50 � Driveway Permit Flat Fee increased from $ 75 to $ 100 � Major Right of Way Encroachment Flat Fee increased from $ 150 to $ 200 � Added Floodplain Development Permit Flat Fee of $ 100 �
Added Construction Drawing Revision Flat Fee of $ 300 + $ 5 / lot
� Added Re-inspection for all Engineering Inspections Flat Fee of $ 100 � Second Re-Inspection Fee of $ 200 � Third Re-Inspection Fee of $ 300 � Fourth Re-Inspection and Each Subsequent of $ 400 � Minor Right of Way Encroachment Flat Fee increased from $ 75 to $ 100 �
�
�
Weekend or After-Hours Inspections ( 3 hour minimum ) Flat Fee increased from $ 80 per hour to $ 100 per hour
Record Drawing Review for Stormwater & SCMs ( 1st and 2nd Review ) Flat Fee increased from $ 150 to $ 200
Record Drawing Review for Stormwater & SCMs ( 3rd and beyond ) Flat Fee increased from $ 75 to $ 100