Fire Code of the Philippines Ebook - SafetySignsPH.com Fire Code of the Philippines eBook - SafetySignsPH | Page 404

bustible liquids may flow from the organic coating manufacturing operation so as to constitute a fire hazard to properties of others, drainage facilities shall be provided in accordance with the following: a. Drainage facilities shall be provided to direct flammable and combustible liquid leakage and fire protection water to a safe location away from the building. b. Emergency drainage systems containing flammable and combus- tible liquids connected to public sewers or discharging into public waterways shall be equipped with traps or separator tanks. c. Emergency drainage systems for leaks of flammable or combustible liquids and for fire protection system discharge shall be provided and shall have curbs, scuppers, or special drainage systems to control the spillage and spread of fire. The containment area shall have a capacity not less than that of the largest tank that can drain into it. B. Process Piping 1. All piping, valves and fittings shall be designed for the working pressures and structural stresses to which they may be subjected. They shall be of steel or other material approved for the service intended. Cast-iron valves, fittings, and pipe shall not be used. 2. Valves shall be of an indicating type. Terminal valves on remote pumping system shall be of the "dead-man" type, which will shut off both the pump and the flow of solvent. 3. Piping systems shall be substantially supported and protected against physical damage. Piping shall be pitched to avoid unintentional trapping of liquids, or suitable drains shall be provided. 4. Approved flexible connectors shall be installed where vibration exists or where frequent movement is necessary. Approved hose shall be used at dispensing stations. 5. Before being placed in service, all piping shall be hydrostatically tested to not less than one and a half (1 ½) times the expected working pressure or thirty five kilo Pascal (35 kpa) at the highest point in the system for a minimum of thirty minutes (30 min) to determine that the piping is free of leaks. C. Electrical Equipment 1. All electrical wiring and equipment within storage or processing areas shall be installed to be reasonably safe to persons and property in accordance with the Philippine Electrical Code and other 388