INSTALLATION INSTRUCTIONS
Z-CLIP TO Z-BAR
INSTALLING Z-BARS
Measure the Z-Clip locations on the back of the panels and
transfer to the wall. Chalking the clips and pressing panels
to the wall can help with location.
Use a laser or snap a line using Z-Clip locations to provide
a wall bar locating guide.
Install Z-Bars using appropriate mechanical fasteners for
the mounting surface. Cut Z-Bars to desired lengths, and
use drops as needed.
Fir out hardware to compensate for uneven walls, assuring
proper face alignment.
Install panel by holding against wall and lowering into place
to engage clips. Ensure that all Z-Clips are engaged.
Add a ‘dab’ of adhesive to mating Z-Clip surfaces to
prevent unwanted movement.
The following are guidelines given in good faith to help
avoid common errors. They are not intended to be a stepby-step list of instructions or a checklist, and it is assumed
the installer has general construction knowledge. Conwed
Designscape|Wall Technology bears no responsibility for any
installation actions taken or not taken, and is not responsible
for installer selection.
HANDLING AND STORAGE
Handle individual panels ‘on edge’ to avoid bending when
moving and carrying.
Store panels on a flat, dry, solid surface. Do not store on
edge.
Take necessary measures to keep panels dry, clean and free
from dust. Pay special attention to edges.
PLANNING THE INSTALL
1. Review the materials list supplied by Conwed
Designscape|Wall Technology (Plant Order) and any
drawings. Carefully determine the starting position of the
first panel. Note markings on panel back include item
number from packing list, then panel tag number.
2. In many cases, standing the panels against walls in
numbered sequence is helpful.
3. Note that a minimum ¾” clearance at the panel top is
required for Clip engagement.
+YWXEJWSR 6SEH
0EH]WQMXL;MWGSRWMR
T: 1-800-932-2383
F: 1-800-833-4798
www.conweddesignscape.com
3[IRW 'SVRMRK%PP 6MKLXW 6IWIVZIH