Finishes Manufacturer's Product Guide Vol. 1 | Page 250

INSTALLATION INSTRUCTIONS Z-BAR TO Z-BAR ‡ Install Z-Bars using appropriate mechanical fasteners for ‡ ‡ ‡ ‡ the mounting surface. Cut Z-Bars to desired lengths, and use drops as needed. Fir out hardware to compensate for uneven walls/ceilings, assuring proper face alignment. Install panel by holding against wall and lowering into place to engage clips. Ensure that all Z-Bars are engaged. Add a ‘dab’ of adhesive to mating Z-Bar surfaces to prevent unwanted movement. For ceiling applications ensure panels are positively locked to prevent disengagement. Some common examples used in the field are as follows: Install single pieces or continuous runs of standard ceiling grid wall angle along the edge of the panels, or purchase fabric-covered angle; install wood trim along the panel edges; install a locking screw (by others) into the ceiling at the outside panel edge. Use a drywall screw into a ceiling joist or a screw-wall anchor combination. The following are guidelines given in good faith to help avoid common errors. They are not intended to be a step-by-step list of instructions or a checklist, and it is assumed the installer has general construction knowledge. Conwed Designscape|Wall Technology bears no responsibility for any installation actions taken or not taken [