INSTALLATION INSTRUCTIONS
Z-BAR WITH HOOK & LOOP
INSTALLING Z-CLIPS WITH HOOK & LOOP
Z-Clips are on the top row only, with Hook & Loop on the
balance of the panel.
Note; mounting gap from wall to panel Z-Clip is 3/16”,
versus 1/8” for Hook & Loop. Panels will be slightly slanted.
Measure the Z-Clip locations on the back of the panels and
transfer to the wall. Chalking the clips and pressing the
panels to the wall can help with location.
Prior to engaging Hook & Loop temporarily hang a panel
or series of panels and check for correct positioning.
With panels removed, remove the taped backing on the
hook and loop.
Engage the Z-Clips and lightly press the Hook & Loop
against the wall, making sure positioning is exact, because
the Hook & Loop fastener is designed for one
application only. Damage to the wall or the panel may
result from removal.
The following are guidelines given in good faith to help avoid
common errors. They are not intended to be a step-by-step
list of instructions or a checklist, and it is assumed the installer
has general construction knowledge. Conwed|Wall Technology
bears no responsibility for any installation actions taken or not
taken, and is not responsible for installer selection.
HANDLING AND STORAGE
Handle individual panels ‘on edge’ to avoid bending when
moving and carrying.
Store panels on a flat, dry, solid surface. Do not store on
edge. Take necessary measures to keep panels dry, clean
and free from dust. Pay special attention to edges.
PLANNING THE INSTALL
1. Review the materials list supplied by Conwed|Wall
Technology (Plant Order) and any drawings. Carefully
determine the starting position of the first panel. Note
markings on panel back include item number from packing
list, then panel tag number.
2. In many cases, standing the panels against walls in
numbered sequence is helpful.
3. Note that a minimum ¾” clearance at the panel top is
required for Clip engagement.