Installation Instructions
SPLINES
WALL & CEILING MOUNTING
COMPLETING THE INSTALL
•
Once the first panel is in place, snugly engage a spline
provided into the kerfed edge, attach to the wall surface
as described above. Note that the spline length is 8’. Plan
full-length splines for panels 8’ and shorter, and 8’ splines
for panels longer than 8’. For these longer panels, center
splines.
•
Engage the next panel on the splined assembly. Be sure
to keep each panel in alignment and plumb.
•
6WHS
Normally the last panel in a run is held by adhesive on
the trailing edge.
FIELD CUTTING
3.
Cut strips of laminate (Formica), hardboard or similar
material to match substrate thickness. Apply to the cut
edge with spray adhesive such as 3M Spray 77. This is
required for a crisp, uniform fabric edge.
6WH
WHS
6WHS
1.
Pull back fabric just beyond field cut. Keep as close to
field cut point as possible without damaging fabric with
field cut.
6WHS
4.
Apply spray adhesive to fabric back, panel edge and 2”
of panel back. Wrap fabric to back and tailor corners to
match unaffected corners using a sharp scissors.
CEILING INSTALLATIONS
2.
Cut and remove excess substrate. A small metal cutting
blade works well to cut hardened fiberglass edges. Trim
the fabric so it will wrap approximately 2” onto the back
of the panel.
Spline installation on ceilings is possible in limited situations.
Usually a maximum distance between splines of 30” is
required for 1” or greater fiberglass thickness, or no more
than 24” for mineral board. Additional adhesive between
splines is required.
+YWXEJWSR 6SEH
0EH]WQMXL;MWGSRWMR
T: 1-800-932-2383
F: 1-800-833-4798
www.conweddesignscape.com
4YF2S&4VMRXIH MR 97%%TVMP
3[IRW 'SVRMRK%PP 6MKLXW 6IWIVZIH
0))( MW E VIKMWXIVIH XVEHIQEVO SJ 97+VIIR &YMPHMRK 'SYRGMP