INSTALLATION INSTRUCTIONS
IMPALING CLIP/ADHESIVE
5. Installers of Conwed Designscape|Wall Technology
products have successfully used the following construction
mastics: PL 200, PL 400 (faster acting), Chemrex 200 and
others. (This is not a product endorsement.)
6. Apply a ‘picture frame’ of adhesive about 1” from the edge
(contacting the vinyl or fabric), and an ‘S’ or ‘W’ in the p
anel center. Position the panel against the wall, tilt back to
release the solvents and then reposition.
7. Use perimeter adhesive as a wet shim to help align the
panel faces.
Contact your local representative for ceiling application.
The following are guidelines given in good faith to help
avoid common errors. They are not intended to be a stepby-step list of instructions or a checklist, and it is assumed
the installer has general construction knowledge. Conwed
Designscape|Wall Technology bears no responsibility for any
installation actions taken or not taken, and is not responsible
for installer selection.
HANDLING AND STORAGE
Handle individual panels ‘on edge’ to avoid bending when
moving and carrying.
Store panels on a flat, dry, solid surface. Do not store on
edge.
Take necessary measures to keep panels dry, clean and free
from dust. Pay special attention to edges.
INSTALLATION
1. The wall surface must be dry and free from dirt, dust,
grease, loose paint, or any foreign matter that would
interfere with a good adhesive bond. If the wall surface is
not reasonably flat then panel alignment will be
compromised.
2. Snap lines on wall both vertically and horizontally keeping
lines plumb and square to create panel locations on the
wall.
3. Impaling clips are designed to help hold panels in place until
adhesive dries.
4. Use the following guide to determine the number of clips
per panel:
+YWXEJWSR 6SEH
0EH]WQMXL;MWGSRWMR
T: 1-800-932-2383
F: 1-800-833-4798
www.conweddesignscape.com
3[IRW 'SVRMRK%PP 6MKLXW 6IWIVZIH
Width
12
12
12
12
12
30
48
48
48
48
48
Height
48
84
108
132
144
48
48
84
108
132
144
# Clips
3
4
5
6
6
5
5
8
10
12
12