Finishes Manufacturer's Product Guide Vol. 1 | Page 126
QuietZone® Acoustic Batts
with PureFiber® Technology
PART 3 - EXECUTION
3.1
EXAMINATION
A.
3.2
Verification of Conditions: Examine installation location and conditions under which work is to be performed. Do not
proceed until satisfactory conditions are achieved.
INSTALLATION
A.
Install products in accordance with manufacturer’s written instructions and in proper relationship with adjacent
construction, including the following.
1.
2.
3.
4.
Friction-fit batts to fill entire height and width of stud cavity.
Cut insulation to fit around penetrations, including outlets, junction boxes and other irregularities. Do not place
insulation within 3 inches of light fixtures or similar electrical devices unless device is labeled for contact with
insulation.
Install unfaced insulation only between wood framing and masonry chimneys. Do not use unfaced or faced
insulation in spaces around metal chimneys, fireplaces or flues.
Protect batts from damage until interior finish is applied.
END OF SECTION
©2014 Owens Corning. All Rights Reserved.