Field Installation and Service Manual IMS105 | Page 10
Step 2
Construct the Corner
Base Cabinet Inside Corner Filler Assembly
Cabinet 1
Cabinet 2
2.1 Bring Cabinet 2 of the corner into
place with its counterpart.
Shim as necessary to line up the two fi ller
halves so that they align both in height and
along their length.
2.3
2.2
Predrill the overlap of the fi ller halves and install
screws to connect the corner.
Confi rm that Cabinet 2 is plumb, level, square and on layout.
Once the corner is assembled, continue the installation of the base cabinets. See IMS 110.
©2017 PCS Professional Cabinet Solutions. All Rights Reserved.
Section 1: IMS 105
10