SPECIFICATIONS OF THE IMPROVEMENT
* Paint Manufacturer Name on Materials Line below. * Paint Name / Paint Number on the Color to be Used Line below, as well as the area where the paint is to be applied( such as Base, Trim, Shutters or Front Door). * If Custom Paint( color not on our paint list), you must attach actual paint color sample or paint color card sample. ** Roof Manufacturer Name( and Warranty, which must be a Minimum of 30 years) on the Materials Line below. ** Shingle Color Name on the Colors to be Used Line below. *** One clean copy of the original survey, and *** 2nd copy of the original survey showing the proposed location of the property improvement. If applicable, the distance measurement from the side and rear property lines from the location of the proposed property improvement is to be clearly written on the site survey plan. **** For replacement of 2 or more cracked pads, all driveway, or ramp replacement you must include a copy of City of Sugar Land Permit( s).
HEIGHT _______________( from ground to highest point) LENGTH _______________ WIDTH _______________ MATERIALS _____________________________________________________________________________________ COLORS TO BE USED _____________________________________________________________________________ COMMENTS:
I understand and agree not to begin the proposed improvement until approval has been given. If construction has already begun, I will cease construction until approval has been granted.
___________________________________ _______________________________________ ___________________ |
OWNER SIGNATURE |
PRINT OWNER’ S SIGNATURE |
DATE |
( Must be legal owner’ s signature) |
|
|
FCCSA USE ONLY – DO NOT WRITE BELOW THIS LINE Subdivision ________________ Unit # _____________ Request Date ________________ Request # ______________
Application Approved: ____________________ Conditions: _______________________________________________ Application Denied: ______________________ Application Incomplete: ___________________
______________________________________________ ______________________________________________
Approval of an Application is valid for 90 days. Work must commence within the 90-day timeframe or the approval becomes invalid. The approved application work must be completed within 120 days from the commencement of receipt of the approval notice.
COMPLETE APPLICATION & EMAIL TO PIC @ FIRSTCOLONY. ORG OR MAIL / FAX TO: FIRST COLONY COMMUNITY SERVICES ASSOCIATION 4350 AUSTIN PARKWAY, SUGAR LAND, TX 77479 FAX: 281-634-9515