Farming Monthly National April 2017 | Page 45

| Buildings Equestrian Winner Rathmoy Stables (American Barn), Newmarket M.D. Anthony Highly Commended Houghall College Equestrian Centre, Durham S & A Fabrications This equestrian centre was built as part of a £12.5 million development of East Durham College’s Houghall Campus. Complex foundations were required due to the location of the site, with 500m³ of concrete having to be laid. With specially-designed ring beam foundations, this project has been recognised for the innovative problem solving. www.farmingmonthly.co.uk Rathmoy Stables is a high quality build project, comprising two identical barns each housing 18 boxes with a central tractor way. The main challenge was the demanding client having requirements above and beyond the norm. The site was adjacent to Newmarket racecourse which meant that during the build extra precautions had to be taken with noise and tidiness. The high detail finishes, such as the slated roof and vented turrets have not only helped with the environmental qualities, but added to the pleasing aesthetics. April 2017 | Farming Monthly | 45