Participants representing a range of stakeholder industries at a Tabletop field day in May , 2019 .
grazing for improved botanical composition and ground cover of pastures ( project total of 480ha ).
• Managing road and fence line drainage ( project total of 5km ), installing runoff diversion banks or contour ripping and fencing ( project total of 50ha ), as suitable for specific sites .
• Sampling at five sites in conjunction with DAF .
Objective 2 : Test and develop suitable techniques for use on a wider range of soil types at six active gully features on the initial properties .
Targeted actions included :
• Fencing 60ha of gullies across six sites and controlling stock access ( project total of 160ha ).
• Undertaking site works based on the most successful gully remediation techniques demonstrated at the trial and other relevant sites , including , where relevant , the management of riparian areas .
• Remediation treatments , including :
o 18 porous check dams for erosion stabilisation .
o Three gully head cut stabilisation structures .
o Three highly active gullies graded or shaped .
o Six soil treatment or replenishment on exposed sodic subsoils using gypsum , compost and seeded grass .
• Revegetation of perennial grasses across 180ha of the gully-contributing subcatchments , including the use of planned grazing practices for improved botanical composition and ground cover of pastures ( project total of 480ha ).
• Managing road and fence line drainage ( project total of 5km ), installing runoff diversion banks or contour ripping and fencing ( project total of 50ha ), as suitable for specific sites .
• Monitoring and sampling by DAF at three sites .
Objective 3 : Encourage spatially connected properties to adopt successful techniques on up to five additional properties .
Targeted actions included :
• Fencing at least 60ha of gullies and controlling stock access ( project total of 160ha ).
• Undertaking gully and landscape restoration based on successful techniques being undertaken , including , where relevant , the management of riparian areas .
P6 — Executive Summary