Enhance Regional Mobility December 2021

INTERSTATE 30 / STATE HIGHWAY 360 INTERCHANGE PROJECT UPDATE ✅

The Texas Department of Transportation ’ s work continues on the $ 233 million Interstate 30 / SH 360 Interchange Project in Arlington . Formerly a toll road loop interchange , the new infrastructure will include main lane improvements and direct connection ramps to each facility . The final two legacy bridges in the interchange project that cross I-30 were demolished in September .
The Interstate 30 / State Highway 360 interchange project is transforming the original cloverleaf design into a modern , fully-directional interchange with connection ramps for all movements between I-30 and SH 360 . These improvements will increase safety , connectivity and mobility for motorists .
This project is split into the following five construction phases :
• Package A : Reconstruction of the Six Flags Drive Bridge over IH‐30
• Package B : IH‐30 / SH‐360 interchange improvements ( continued on page 2 )

Q1 UPDATE · FY 2022

• Pages 1-2 - Interstate 30 / SH 360 Interchange Project Update | Southeast Connector Project Update✅
• Pages 3-5 - Citywide Street Projects and Updates ✅
• Page 6 - City Completes Improvements to Hanover Drive , Windermere Drive , and Vanderbilt Drive ✅
• Page 7 - TxDOT Launches Online Public Survey for the I-20 Corridor Study | City Purchases First Fleet of Electric Vehicles
• Page 8 - Scorecard Metrics for FY21-Q3 ✅

✅ - Enhance Regional Mobility Business Plan Update

WWW . ARLINGTONTX . GOV | Connect with us ! @ CITYOFARLINGTON