Electrical Contracting News (ECN) September 2017 | Page 57
TEST & MEASUREMENT
now, there has been no universal solution
for storing and transporting both test
meters and tools, nor one that included all
the essential tools required for diagnostic
testing and fi nal certifi cation.
Made-to-measure storage
Consulting directly with end users, CK
Magma researched how electricians store
and transport test equipment and noticed
this gap in the market. With this insight in
mind, the new product development team
set about designing convenient solutions to
these everyday problems and developed the
CK Magma test equipment case and the CK
Magma test equipment case toolkit.
The test equipment case allows
electricians to carry diagnostic testing
equipment and a selection of essential
tools in one handy case. It is thought to
be the fi rst of its kind to feature made-
to-measure storage for both a test meter
and toolkit, removing the inconvenience of
having to transport them separately.
Working closely with a dedicated group
of professional tradesmen, CK Magma
was able to create products that meet
their current working needs. Feedback
revealed an acute need for a single solution
that would allow electricians to transport
a diagnostic testing kit and a selection
of essential tools without having to carry
their full toolkit. Both the CK Magma test
equipment case and toolkit are a direct
result of this process and have been well
received by electricians.
Convenient solutions
Featuring rubber feet and adjustable
padded compartments, the case
provides durable, safe storage for
testing equipment, plus a separate top
compartment for storing necessary tools
and accessories.
With 27 accessible pockets, including
a documentation holder, technicians
can carry all the fundamental tools and
documents for diagnostic testing, without
the need for any separate boxes, cases or
bags. The padded shoulder strap makes
it convenient to hold while carrying out
equipment testing, while a lockable zip
system helps protect expensive tools.
Alternatively, the CK Magma test
equipment case toolkit combines the
test equipment case with a selection of
essential tools, including CK dextroVDE
screwdrivers with all the most popular
tip sizes. The kit also includes side
cutters and snipe nose pliers from the
CK Redline VDE range, a CK non-contact
voltage detector and CK LED 100 lumens
hand torch.
Create competitive standout
With en d-users at the heart of this new
development, electricians are welcoming
the improvements offered by both products.
Utilising them can save time on tools,
leaving more time for excellent customer
service, which is just as important as the
job in hand.
SPECIAL
FEATURE
‘Until now,
there has
been no
universal
solution for
storing and
transporting
both test
meters and
tools.’
In an industry with over 268,000
contractors, it has never been more vital
to do a job effi ciently and successfully to
create competitive standout. Given that the
UK electrical contracting market is worth
over £20 billion, it is vital for electricians to
harness this insight in order to take their
share of this lucrative industry.
Organisation is
key to reassuring
customers that
the person they’ve
employed is
completing the job
effi ciently and with
expertise.
Lasnek.
Because
Quality Matters
Stainless Steel Cable Management Systems
• The stainless steel containment specialist
• Choice of containment types & finishes
• Bespoke manufacturing service
• Large stock availability
www.lasnek.com • [email protected]
Lasnek Ltd, 1 President Way, Luton, Bedfordshire LU2 9NR
Tel: +44 (0) 1582 425 777
ELECTRICAL CONTACTING NEWS - FEB 2017 - 224 X 159.indd 1
16/02/2017 14:45