Step 3 Determine throughput
required (m 3 /hr)
950
900
You can establish the throughput you require of your conveyor using the simple
formula below. To calculate this step you will need to know the mass of material
you want to move per hour and the material’s density.
850
tonnes/m 3 = throughput of
Now that you have established the throughput and desired angle of your
conveyor, use the chart opposite to work out the conveyor size and belt speed
you require. With our worked example we have a throughput of 58m 3 /hr and a
conveyor angle of 20°.
This means that the conveyor size we need is an EASIKIT 600 with a belt speed of
0.7m/s. (Indicated by dotted line on chart)
Please note that these calculations do not include EASIKIT300.
10
11
12
13
14
15
16
17
18
EK900 - 0.93
EK900 - 0.7
EK900 - 0.3
EK600 - 1.16
EK600 - 0.93
EK600 - 0.7
EK600 - 0.3
EK450 - 0.84
EK450 - 0.64
700
2
650
600
550
3
500
450
Step 4 Choose conveyor size &
belt speed
EK1500 - 1.16
EK1500 - 0.93
EK1500 - 0.7
EK1500 - 0.3
EK1200 - 1.16
EK1200 - 0.93
EK1200 - 0.7
EK1200 - 0.3
EK900 - 1.16
750
tonnes/hr ÷
m 3 /hr
1
800
Worked Example 70 tonnes/hr ÷ 1.2 tonnes/m 3 = throughput of
58 m 3 /hr
Your Solution
1
2
3
4
5
6
7
8
9
1000
5
400
6
350
9
300
10
12
11
13
14
16
15
17
18
7
250
4
200
150
8
100
50
0
1
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
Conveyor