I
Renewable Energy
Documentation: The Rater will collect the following: Copies of energy compliance reports Calculations of total of home energy use based on compliance threshold
An estimate of renewable energy production using documents identified in the Criteria for Qualification section of this measure, and the percentage of renewable contribution from the builder or another appropriate expert. The contractor must supply a copy of the CF-6R-PV solar report( or other appropriate forms) based on what was actually built( that is, the system size, output, and percentage of load served by the photovoltaic system). If a HERS Rater is completing the inspection, he or she will provide the CF-4R- PV after installation.
INTENT
To conserve fossil fuels used for electricity generation and reduce pressure on the electrical grid by using renewable energy sources.
DRAFT
DRAFT GreenPoint Rated New Home Rating Manual 64 Version 6.0, September 2013
© Build It Green