the subcontractors performing the test manipulating the equipment to make sure the equipment passes the test. The commissioning coordinator does not actually operate the equipment.
Practices to be completed by the commissioning coordinator for this measure include the following:
� Obtain and review submittals. � Coordinate startup activities. � Monitor the testing and balancing measures completed and reviewed. � Coordinate functional testing.
P3.3. Post-Construction Phase( 2 Points)
The commissioning coordinator will verify compliance and confirm that all issues identified during the commissioning process have been resolved. The commissioning coordinator will establish training requirements for appropriate employees who will use commissioned equipment and systems. The commissioning coordinator will assemble warranty documents and confirm that they are clear, dated, and complete. The commissioning coordinator will complete a summary report that includes all relevant commissioning documents. Provisions to elicit comments on the occupant / tenant experience via an owner survey of residents and tenants should be enacted approximately eight to ten months after the completion of the building.
Practices to be completed by the commissioning coordinator for this measure include the following:
� Provide training criteria and confirm completion. � Submit commissioning report. � Conduct warranty review. � Make provisions to survey residents and tenants after eight to ten months of occupancy, and report findings
VERIFICATION Measure P3.1
Documentation: The commissioning coordinator will provide an Accountability Form to the Rater confirming the completion of the practices required for the design phase. The Rater may request a copy of the commissioning plan and / or the OPR.
Measure P3.2
Documentation: The commissioning coordinator will provide an Accountability Form to the Rater confirming completion of practices required for the construction phase. The Rater may request copies of the test results.
Measure P3.3

DRAFT

Documentation: The commissioning coordinator will provide an Accountability Form to the Rater confirming completion of practices required for the post-construction phase. The Rater may request copies of the commissioning report and test results.
INTENT To ensure the installed systems operate as efficiently as designed.
DRAFT GreenPoint Rated New Home Rating Manual Version 6.0, September 2013 117 © Build It Green