Doing Business México 2020 MEX | Page 35

Doing Business 2020 Mexico Getting Electricity - Monterrey Standardized Connection Name of utility Comisión Federal de Electricidad (CFE Distribución) Price of electricity (US cents per kWh) 13.9 City Covered Monterrey Indicator Monterrey Latin America & Caribbean OECD high income Best Regulatory Performance Procedures (number) 6 5.5 4.4 3 (28 Economies) Time (days) 44 66.8 74.8 18 (3 Economies) Cost (% of income per capita) 182.0 407.2 61.0 0.0 (3 Economies) Reliability of supply and transparency of tariff index (0-8) 7 4.4 7.4 8 (26 Economies) Figure – Getting Electricity in Monterrey – Score 50.0 88.7 97.8 87.5 Procedures Time Cost Reliability of supply and transparency of tariff index Figure – Getting Electricity in Monterrey and comparator economies – Ranking and Score DB 2020 Getting Electricity Score 0 100 85.7: Chile (Rank: 39) 82.2: United States (Rank: 64) 81.0: Monterrey 76.3: Colombia (Rank: 82) 72.8: Brazil (Rank: 98) 69.1: Mexico City Note: The ranking of economies on the ease of getting electricity is determined by sorting their scores for getting electricity. These scores are the simple average of the scores for all the component indicators except the price of electricity. Figure – Getting Electricity in Monterrey – Procedure, Time and Cost Time (days) Cost (% of income per capita) 180 160 35 140 30 120 25 100 20 80 15 60 10 40 5 20 0 40 0 1 2 * 3 4 * 5 6 Procedures (number) * This symbol is shown beside procedure numbers that take place simultaneously with the previous procedure. Note: Online procedures account for 0.5 days in the total time calculation. For economies that have a different procedure list for men and women, the graph shows the time for women. For more information on methodology, see the Doing Business website ( http://doingbusiness.org/en/methodology ). For details on the procedures Page 35