Doing Business México 2020 MEX | Página 31

Doing Business 2020 Mexico Getting Electricity - Mexico City Standardized Connection Name of utility CFE Distribución Price of electricity (US cents per kWh) 17.0 City Covered Mexico City Indicator Mexico City Latin America & Caribbean OECD high income Best Regulatory Performance Procedures (number) 7 5.5 4.4 3 (28 Economies) Time (days) 112 66.8 74.8 18 (3 Economies) Cost (% of income per capita) 281.3 407.2 61.0 0.0 (3 Economies) Reliability of supply and transparency of tariff index (0-8) 7 4.4 7.4 8 (26 Economies) Figure – Getting Electricity in Mexico City – Score 33.3 59.1 96.5 87.5 Procedures Time Cost Reliability of supply and transparency of tariff index Figure – Getting Electricity in Mexico City and comparator economies – Ranking and Score DB 2020 Getting Electricity Score 0 100 85.7: Chile (Rank: 39) 82.2: United States (Rank: 64) 81.0: Monterrey 76.3: Colombia (Rank: 82) 72.8: Brazil (Rank: 98) 69.1: Mexico City Note: The ranking of economies on the ease of getting electricity is determined by sorting their scores for getting electricity. These scores are the simple average of the scores for all the component indicators except the price of electricity. Figure – Getting Electricity in Mexico City – Procedure, Time and Cost Time (days) Cost (% of income per capita) 300 250 80 200 60 150 40 100 20 100 50 0 0 1 2 * 3 4 5 * 6 7 Procedures (number) * This symbol is shown beside procedure numbers that take place simultaneously with the previous procedure. Note: Online procedures account for 0.5 days in the total time calculation. For economies that have a different procedure list for men and women, the graph shows the time for women. For more information on methodology, see the Doing Business website ( http://doingbusiness.org/en/methodology ). For details on the procedures Page 31