Doing Business 2020
Mexico
Figure – Dealing with Construction Permits in Monterrey – Procedure, Time and Cost
Time (days)
Cost (% of warehouse value)
1
0.8
80
0.6
60
0.4
40
100
0.2
20
0
0
1
2
* 3
* 4
5
6
7
8
9
10
11
12
13
Procedures (number)
* This symbol is shown beside procedure numbers that take place simultaneously with the previous procedure.
Note: Online procedures account for 0.5 days in the total time calculation. For economies that have a different procedure list for men and women, the graph shows the
time for women. For more information on methodology, see the Doing Business website ( http://doingbusiness.org/en/methodology ). For details on the procedures
reflected here, see the summary below.
Page 23