Dobbins JLUS IMP Public Draft Light Pollution Study | Page 118

7.6. Certification of Installation. For all projects where the t otal outdoor light output of the proposed lighting equals or exceeds 300,000 lumens , certification that the lighting, as installed , conforms to the approved plans shall be provided by a registered engineer, architect or landscape architect before the certificate of occupancy is issued. Section 8. Approved Materials and Methods of Construction or Installation/Operation. 10.2. Approval; Duration. The designated official shall, within five (5) business days from the date of submission of the request for temporary exemption, approve or delay the request in writing. If approved, the exemption shall be valid for n