District Directions April 2014 (Vol. 1, No. 1)

April 2014 District Directions Vol. 1, No. 1

Construction Update

Construction continues on additions to Piedmont High School. The current cafeteria is undergoing expansion. Two additional classrooms and restrooms are being constructed in the southwest corner of the building. These items will provide much needed space for our rapidly increasing enrollment. As a safety enhancement, a secured entrance and attendance office are being built at the front of the building. This will require visitors to check in at the office before entering. The largest piece of the current construction includes a physical education gymnasium, wrestling room, restrooms, locker rooms, and a training room. The new gym will eliminate the need to bus students enrolled in PE/Wellness to Piedmont Elementary for class each day. Our wrestlers currently practice in a metal building that was once used as an agricultural barn. The new wrestling room will give them the first-class facility they deserve. Completion of these projects is expected during the summer months. Click here to learn more about these additions.

Please press the play button on the left for a welcome message from Dr. James White, Superintendent.