Design Buy Build Issue 45 2020 | Page 9

EDITORS CHOICE HELIFIX MICRO-PILE FOUNDATIONS INSTALLED IN JUST ONE DAY ANCON OFFERING ENHANCED NON-COMBUSTIBLE BALCONY CONNECTOR RANGE reduced to 11 metres, extending the scope of the regulations to buildings over 4-storeys and affecting the vast majority of new flats, hospitals, residential care premises and student Investigative work for a single storey workshop extension showed that load bearing depth and soil composition varied across the whole area of the proposed site. These observations and the need for economical and reliable foundations to be installed quickly, whilst causing minimal disruption, resulted in the specification of Helifix Micro-piles as the solution. Not only would the Micro-piles provide rapid, costeffective structural support for the new building, they would cause much less disruption compared to traditional high volume concrete pours. The installation was so rapid that the foundations were installed in just one day, with no spoil removal, vibrations or major interuptions to the existing commercial property. Each of the six Micro-piles required were simply ‘screwed’ vertically into the ground, at the appropriate locations, using a hydraulic drive head. To find out more about Helifix Micro-piles for new build or foundation stabilisation visit www.helifix.co.uk or contact our team at [email protected] Ancon is leading the way in developing solutions to meet the Government’s tough new fire safety requirements for buildings, with the launch of an upgraded range of non-combustible insulated balcony connectors. The development follows news that the existing 18 metres height limit for combustible materials in high rise multi-occupancy buildings is to be further accommodation. This has again increased the focus on fire safety with contractors and developers looking to future-proof their buildings. Connectors are available in a range of types, including Ancon Isotec for concrete to concrete applications, Ancon STS for anchoring steel balconies to a structural steel frame, and Ancon STC for steel to concrete fixing. For further information or advice contact Ancon’s Technical Team on 01142755224 or email [email protected]. 9