Heating, Ventilation & Insulation
Rinnai Continuous Flow Hot Water System
Specified in Food Manufacture Plant
A Rinnai continuous flow hot water
solution has been installed at a
large-scale seafood processing and
manufacturing plant on the North East
coast. The system was installed by H
Pickup & Sons having used Rinnai
products for several years on major
projects.
H Pickup Mechanical & Electrical
Services Limited were established
over 100 years ago and are based in
Scarborough, North Yorkshire. The
company offer a comprehensive range
of mechanical & electrical services
direct to their clients: Electrical
Building Services; Mechanical
Building Services; Planned & Reactive
Maintenance; Gas Servicing; Heating
and Plumbing Services; Electrical &
Mechanical Design & Installation
Services and Contract Management.
“We employ our own staff engineers
both on site and in contract
management in order to enable us to
deliver unprecedented service and
ongoing support to our customers”, says
Mike Joy for Pickups.
38
The food manufacture site had an old
stored hot water system which was no
longer able to cope with the demand for
the high volume and high temperature
hot water needed for cleaning down
production areas as the site increased
its production lines, as it expanded its
market ordering and product range. The
site was also looking to substantially
increase energy, fuel cost efficiency and
reliability by removing the stored hot
water.