HIGH-SPEC BRIDGE FOR LUXURY
APARTMENTS IN CHELSEA
To complete the hard landscaping around
the Chelsea Creek luxury apartment
development, London developer,
Berkeley St George needed a statement
bridge.
The 24m long bridge comprises a
deceptively simple, elegant concept
incorporating acrylic rods into the
painted steel frame at close centres
which, when lit from their base, provide
an illuminated enclosure, while a stripped
down secondary internal handrail
provides pedestrian restraint.
CTS were appointed to undertake
design, manufacture and installation
and offered different structural options
to best achieve the architectural intent,
resulting in “hidden” structural supports
to minimise beam depth. They worked
closely with Elite Landscapes, the
Principal Contractor, to ensure all trades
were coordinated to deliver a successful
scheme.
power supply and driver units discreetly.
Precision fabrication was needed to
realise this ambition.
The final result is a stunning illuminated
bridge that provides a stylish focal
point over the meandering waterway the
Chelsea Creek development.
If you need a bridge as a focal point in
your scheme contact CTS Bridges for a
full design, build and installation package.
To complete the hard landscaping around
the
Chelsea
Creek luxury apartment development, Lon
To achieve
the desired
simple lines,
careful detailing was required to house
[email protected]
developer, Berkeley St George needed
a statement bridge.
the lighting rods and conceal their
www.ctsbridges.co.uk
The 24m long bridge comprises a deceptively simple, elegant concept incorporating acrylic rods
painted steel frame at close centres which, when lit from their base, provide an illuminated enclo
stripped down secondary internal handrail provides pedestrian restraint.
CTS were appointed to undertake design, manufacture and installation and offered different struc
o best achieve the architectural intent, resulting in “hidden” structural supports to minimise beam
worked closely with Elite Landscapes, the Principal Contractor, to ensure all trades were coordin
DESIGN BUILD INSTALL
deliver a successful scheme.
Delivering quality structures
across the UK
To achieve the desired simple lines, careful detailing was required to house the lighting rods and
power supply and driver units discreetly. Precision fabrication was needed
to realise this ambition
• BRIDGES
The final result is a stunning illuminated bridge that provides a stylish focal
point over the meand
• BOARDWALKS
waterway the Chelsea Creek development.
• STRUCTURES
f you need a bridge as a focal point in your scheme contact CTS Bridges for a full design, build a
nstallation package.
• LOCK GATES
• DECKING
01484 606416 [email protected] www.ctsbridges.co.uk
67