Design Buy Build Issue 26 2017 | Page 65

Case study 1 Case study 2 This was a system for a typical, small, pre- This was a system for a shower block in a fabricated fast food restaurant. It is assumed holiday camp, with six showers and four the system only serves the hot water demand. basin taps. The life cycle analysis includes the initial For the continuous flow option, the analysis single continuous flow water heater would capital costs, projected annual fuel costs, and is based on a configuration of 4 continuous equate to an efficiency of 95% based on estimated annual servicing costs which are flow water heaters that each have a nominal the performance curve. As the hot water assumed to increase by 2% each year. output of 48 kW, which, for this particular demand increases, the modular nature of this Each shower would typically have a flow rate of around 9 litres per minute, which if mixed to 40ºC would equate to an instantaneous load of around 19 kW each, so even if there was only one shower running, the load on a application, because there is a very short particular configuration would allow the 95% The annual fuel cost assumes the same daily run of pipe work between the water heaters efficiency to be maintained for the bulk of the fuel consumption over the whole year. and the fixtures, it is possible for the water demand. The servicing cost is based on £130/year per boiler, and £160/year for a boiler and cylinder. The resulting net present values of heaters to generate water at 40°C. The risk of legionella is overcome by the regular turnover of the system. The difference in daily fuel costs between the three systems is around 7%. The usage profile for this case study is particularly the three showed that the continuous flow For the energy required to deal with the suited to continuous flow systems (i.e. system is 6 - 7% lower than the two storage instantaneous hot water demand the analysis high but infrequent demand over the day), systems based on that 20-year analysis assumes that the bulk of the hot water which is why there is an advantage in fuel period. demand would be due to the showers. consumption over the storage systems. For more information on the RINNAI product range of high efficiency condensing continuous flow hot water heating units and systems visit www.rinnaiuk.com