Design Buy Build Issue 16 2015 | Page 115

The Network Rail tunnel beneath the site presents a number of significant challenges to the construction of the overall building. The 7m curved cantilever is supported by a concrete frame which in turn is separated from the foundations by acoustic 'springs'. The urban characteristics of the south facing site have provoked a sustainable design response to the building by the introduction of an “environmental skin” with 92sqm of solar thermal panels on the south/south west curved fa