Reduce Operational Costs, Improve
Capacity Utilization, and Lower
Power Usage Effectiveness (PUE)*
Driven by explosive data processing growth, Data
Centre Managers face multiple, competing demands:
reducing operational costs, improving energy
efficiency, and optimizing available capacity, while
sustaining a low total cost of ownership.
To meet these demands while minimizing the risk
to service levels, the available data centre space is
often underutilized while being overprovisioned
with excess power and cooling capacity regardless
of actual IT equipment and space utilization. Today,
a typical data centre consumes about 3-5kW per
cabinet due to power and cooling concerns, while
the available cabinet space can accommodate
15kW or more per cabinet if managed effectively.
As energy and construction costs continue to
rise, over-provisioning and under-utilization are no
longer sustainable. Energy costs related to cooling
account for approximately 37% of the overall data
centre power consumption and are one of the
fastest rising data centre operational costs.
RWL Advanced Solutions and Panduit offer
a best of breed data centre infrastructure
which includes energy efficient industry leading
cabinet and connectivity solutions.
Visit https://www.panduit.com/en/solutions/
data-center.html for further information
RWL Advanced Solutions UK 9 Devonshire Square, London, EC2M 4YF. +44 (0)207 084 6219