53 business that respects this legacy and builds on the achievements of those who have gone before us .
The Raby team have now completed the first phase of restoration works which will see this incredible Grade I Listed Building being taken off the buildings at risk register . The works have included installation of steel ties to the main walls and roof timbers , a complete re-roof , rebuild and repair of the chimneys , repointing the entire building and installation of new leaded windows . In addition to the hall itself , we have also restored the Dovecote to its former glory , securing the future of both for generations to come .
They used no less than 5 ton of hydraulic lime , 25 ton of sand and 2 ton of timber , which was milled from seasoned oak grown on the Raby Estate .
Specialist Ground Source System Design and Borehole Installation
Further plans are now being considered to move onto phase 2 , which will see the refurbishment of the interior of the hall to provide modern accommodation and restoration of the farm buildings .
‘ Close to nature ’ takes on a new meaning in The Plotters ’ Forest . Built around the existing trees and natural clearings with sustainable materials , the play equipment feels woven into the forest ; an extension of the great outdoors . They ’ ve taken care to respect their beautiful natural environment , with larch cladding sourced from their sustainably managed woodland and colours inspired by the forest ’ s stunning palette .
The Raby Estate firmly believe that building a relationship with the outdoors inspires children to be resilient , curious and courageous . In an increasingly digital and risk-averse world , The Plotters ’ Forest is a setting where little ones – and their imaginations – can run wild .
Energy House , Meadows Drive , Staveley , Chesterfield S43 3LH T : 01246 938499 E : info @ groundsourcesolutions . co . uk www . groundsourcesolutions . co . uk