Achievements in FY 24 / 25

LactaLogics

LactaLogics is nearing completion of its 70,000-square-foot human milk processing facility in eastern Port St. Lucie. The facility will include a high-capacity freezer and advanced processing systems, while also serving as the home to the LactaLogics Donor Success Team, a group dedicated to providing comprehensive support for donor moms. Once in operation, the facility will collect surplus breast milk from donors nationwide, process it using proprietary Gentle-UHT™ human milk pasteurization technology, and distribute the milk to NICUs and families nationwide. By addressing critical supply chain gaps, LactaLogics will be able to ensure that more families have reliable access to lifechanging human milk nutrition.

Connecting people with the Village Green Drive Corridor

The Village Green Drive Corridor Master Plan was well received and adopted by City Council in Summer 2021. In 2024, the City pursued and received a RAISE Grant for the design Phase of the project. A consultant was contracted in June 2025 to begin the process with the design scheduled to be complete by the end of 2026.
While the roadway design was underway, CRA, Parks & Recreation and Public Works staff moved forward with the design of an integral piece of the plan: the Hog Pen Slough Boardwalk Trail. This is just one component of the overall Master Plan which is intended to stimulate economic development, further connecting the community, and will make for a safer, more walkable pedestrian and bicycle environment along the Village Green Drive corridor. The Hog Pen Slough area has long been identified as a microbial hotspot and enhancements to the slough itself will help to reduce pollutants and improve flood control in eastern Port St. Lucie.
2025 ANNUAL REPORT COMMUNITY REDEVELOPMENT AGENCY Page 12