Corrected ARC Guidelines PRINT FULL SETS - Master PDF 112 Pages - as of 9-2 | Page 35

EXISTING FRONT ENTRY DOOR MODIFICATIONS 2.4 ANY CHANGE TO THE OUTSIDE OF THE HOME REQUIRES BOTH NARC AND ACC APPROVAL 1. Obtain an application form from Kings Ridge Management Office (CMO) located at the clubhouse. Submit the application form with a copy of the following; the guideline, vendor brochure to illustrate design(s), and specifications, and any other pertinent information. Return your completed application to the CMO. 2. Do not start construction of any improvement, alteration, or addition to any existing structure or make any site improvements or changes prior to approval. After approval by the ACC, proposed work shall start within 45 days and shall be completed within 180 days of commencement. Time extensions may be granted by the NARC upon written request. 3. Kick Plates a. Kick plates compatible with door or door hardware may be installed on the front entry door. The kick plate shall be approximately 8 inches in height and 2 inches less than the door width. b. Maintain kick plate, clean, replace, or repair as necessary to assure an aesthetic appearance. 4. Glass Inserts Front entry doors may have decorative glass insert installed in the existing door and/or sidelights. 5. Door Hardware Exact replacement of door hardware does not require approval. Changing color of hardware or modifications of door hardware require approval. Homeowner may choose from the following finishes, for example; satin nickel, antique brass, bronze, black, and keyless entry hardware locks. Page 1 of 2 Approved by the Board of Directors April 26, 2017 Effective April 26, 2017