Cool Springs Multimodal Transportation Study JUN_2015_Final Cool_Springs_Report | Page 25
Circulator Route Cost Summary
The total startup cost for transit would be around $4.5 million for the first year, with subsequent years being
around $1.8 million.
Below are the bare minimum costs for the Circulator Option if:
• Service begins using the current equipment type - Cutaway vehicles
• The Circulator runs in just one direction
• The frequency of service is reduced - 30-minute service during peak only hours only
• No night route
Startup Costs Year One: $2.3 million
Operating Costs Subsequent Years: $860,000
Below are the bare minimum costs for the Circulator Option if:
• Service begins using the current equipment type - Cutaway vehicles
• The Circulator runs in just one direction
• The frequency of service is reduced - 60-minute service all day
• No night route
Startup Costs Year One: $1.4 million
Operating Costs Subsequent Years: $735,000
Cool Springs | Multimodal Transportation Network Study
19