Cool Springs Multimodal Transportation Study JUN_2015_Final Cool_Springs_Report | Page 17
Arterial Route Cost Summary
The total startup cost for transit would be around $4 million for the first year, with subsequent years being
around $1.6 million.
Below are the bare minimum costs for the Arterial Option if:
• Service begins using the current equipment type - Cutaway vehicles
• The frequency of service is reduced - 30-minute service during morning and afternoon peak hours only
• No night route
Startup Costs Year One: $2.8 million
Operating Costs Subsequent Years: $1.4 million
Below are the bare minimum costs for the Arterial Option if:
• Service begins using the current equipment type - Cutaway vehicles
• The frequency of service is reduced - 60-minute service all day and
• No night route
Startup Costs Year One: $1.6 million
Operating Costs Subsequent Years: $1.1 million
Cool Springs | Multimodal Transportation Network Study
11