Cold Link Africa September 2019 | Page 15

PROJECT INCORPORATING COLD CHAIN 1 2 3 • • • • • • • • • • 4 Danfoss medium pressure valve which maintains a constant pressure in the liquid receiver. Plate Heat Exchanger mounted on the common discharge line for the supply of 5 000 litres per hour of hot water at 60°C to the facility. A cold-water supply of 2 000 litres per hour at 7°C. Gas detection system in the plant rooms with audible and visible alarms. Two gas coolers installed with EC fans that each deliver a capacity of 684kW. Various evaporators for each room in the facility making use of hot gas defrost where applicable. Only one third of the low temperature load on each rack can be defrosted at any given time to ensure there is enough heat generated. Electronic expansion valves were installed on all the evaporator coils. Gas detectors are also installed near the bottom of each room with audible and visual alarms. Valve stations are installed at each evaporator coil in order to facilitate maintenance with an additional bypass valve to ensure any liquid that gets trapped can boil off again. The new CO 2 plant is currently realising energy savings of about 30% compared to the old plant, which the client is very happy about. Redundancy was built into the system to ensure they wouldn’t experience any downtime when anything went wrong with the refrigeration plant. 1. Samon leak detectors. 2. Modine pull down freezer blower coil. 3. Outdoor refrigeration plant. 4. Inside the holding freezer. COLD LINK AFRICA • SEPTEMBER 2019 www.coldlinkafrica.co.za 15