Alternate view of LT Bitzer racks on sides , Ammonia vessels , LT on left , intercooler vessel on right . applications in industrial and commercial markets to meet the growing demand for high efficient , natural refrigerant solutions .
ELEMENTS OF DIFFICULTY ON THE PROJECT The processing plant had to be constructed inside a historical building with concrete trusses and roofs . Central Specialist Group had to develop special clamp on brackets to hang the primary pipe support steel from the trusses .
Pipe routing had to be planned according to the loading capabilities of the existing structure and void heights . The processing facility also needed to be constructed with stainless steel insulated panels and trimmings for food hygiene reasons and was required to be durable due to exposure on a daily basis to high-pressure washing .
SYSTEM IMPACT ON ENERGY EFFICIENT AND SUSTAINABLE The system has been designed with optimized condensing and evaporation temperatures to optimise system coefficient of performance ( COP ). The natural refrigerant ammonia had been set as the preference for its highest efficiency , longest plant life expectancy and sustainability aspects having a zero global warming and ozone depletion potential . Bitzer screw packs have optimal working-hours between major service intervals , providing low life cycle cost .
With the recovery of waste heat from the refrigeration plant , the client is saving on coal consumption in the steam plant and ensuring that the total installation reaches peak environmental sustainability .
Ammonia vessels , LT on left , intercooler vessel in middle , MT vessel on right , MT Bitzer rack on right . |
LIST OF PROFESSIONALS : |
Project name : |
Sovereign Foods - New Final Processing Plant |
Name of company |
Owner - Refrigeration & Steam Plant |
Energy Partners |
Developer |
Sovereign Foods |
Architect / Designer |
Central Specialist Group |
Project manager |
Central Specialist Group |
|
Mechanical ( HVAC & R ) |
Energy Partners Engineering |
Consulting engineer |
Insulated panels |
Energy Partners Engineering |
|
Civil & structural |
Central Specialist Group |
|
Main contract managers |
Gramic |
Contractors |
HVAC & R |
Energy Partners Refrigeration & Steam |
|
Insulated panels |
Insulated door systems |
|
Product |
Supplier |
|
Compressors |
Bitzer |
|
Condensers |
BAC |
Product suppliers |
Evaporators
Plate heat exchangers
|
HC
Alfa Laval
|
|
Ammonia Valves |
Danfoss |
|
Electrical boards |
IMC |
|
Insulation |
Intertherm |
UNIQUE ELEMENTS This is the largest CaaS project in Africa and the first to combine refrigeration and steam as a utility-outsource solution for the client .
This project is also home to the first large scale industrial ammonia plant utilizing the Bitzer ACP compressor packs . The total planned cooling consumption will be 1.74 million kWRh per year . CLA
COLD LINK AFRICA • October 2021 www . coldlinkafrica . co . za 25