Cold Link Africa May 2019 | Page 13

PROJECT INCORPORATING COLD CHAIN 1 2 terms of the cost of refrigeration for a and a maintenance fee that make up set period, and the responsibility for the set monthly cost for the service. Along maintenance and operation would fall with that, there is also the variable charge on EP Refrigeration for the duration of for refrigeration, which is measured in the contract. kilowatt-hours refrigeration (kWhR). Energy Partners operates on a tariff 3 To accurately quantify and measure structure that is similar to most other refrigeration, and to bill the client utilities. This includes an availability charge correctly, EP Refrigeration pioneered 5 4 1. Tumbling room. 2. Pickling room. 3. Holding room. 4. Carcass room. 5. Blast chiller. COLD LINK AFRICA • May 2019 www.coldlinkafrica.co.za 13