Cold Link Africa March/April 2019 | Page 18

PROJECT INCORPORATING COLD CHAIN Steel structure with chilled water evaporators placed. cooling or heating. It can maintain a high level of humidity and cool/heat at the same time. CO 2 levels are monitored and they control the extract fans accordingly, so no unnecessary air is extracted, preventing loss of ethylene gas, humidity, and temperature. They make use of a Class 6 gas-tight fully automated door — this door de-creases the leakage accrued in traditional de-greening rooms as well as controls access during operation. An operation platform has been created, where the manager will set de-greening parameters and the operator will select the type of fruit to be de-greened. The system will adjust all settings accordingly. This means, for instance, you can de-green oranges today and lemons tomorrow. By selecting lemons, all settings will be changed to lemons, and after that oranges can be de-greened again by selecting the oranges. The settings and the process will be exactly the same as the first oranges that were de-greened. Also, this type of layout was new to the construction and structural contractors and San Group had to work closely with them to avoid misunderstandings. LIST OF PROFESSIONALS CHALLENGES Owner / developer   Endulini Fruit The biggest challenge was that most components required could not be bought off the shelf or from catalogues, and San Group had to engineer/design and manufacture most components for this project. “We were given a short project completion time by the client, and we had to import and plan all deliveries of equipment as well as coordinate services on site to ensure everything happened according to schedule,” explains Van Zyl. Project manager   Viaplan – JJ Kriel Consulting engineers Contractors Suppliers Heat pump chiller for each de-greening room. 18 But in the end, everything came together and the client was very happy with the end result, which exceeded his expectations. CLA Electrical Broad Automation Refrigeration San Group Wet services Rand Civils Civil Rand Civils Main building Rand Civils / Endulini Fruit HVAC & R San Group Wet services Rand Civils Electrical Broad Automation Evaporators HC Heat Exchangers  Heat pump chiller Daikin Control system Eliwell – Keystar  Sensors/probes Eliwell – Keystar Electrical DBs Broad Automation  Fans Elta – Midair Sectional door BG Doors  Pipe lagging U-Lag Chilled water piping Rifeng Humidity system Carel Gauges Wika Pressure regulators Honeywell Three-way valve Siemens Balancing valves Instruments 4 You Solenoid valves Burkert Flow meter Rebus Control Ethylene system Wika www.coldlinkafrica.co.za COLD LINK AFRICA • March/April 2019